| |
Case: 3 storey movable office building for construction company.
|
Task:
The customer, a major construction company, needed a flexible and
movable office building. A company producing industrial module buildings delivered the solution and MicroVent was built into the moduleelements before delivery.
Solution:
A movable building in 3 floors of offices, conference room, copy room and toilets. MicroVent was chosen because the pipe-free system is space saving and made it possible for the manufacturer of the module construction to install the ventilation at the factory even before the building was delivered.
Effect:
The customer got a module office building with a flexible and space saving ventilation system. The building can be moved as a whole or in sections and can function individually on three different building sites without having to establish a new ventilation system. |
| | |
|
|
|
|