+45 72 30 10 24

Apartment buildings

Case: Grønnegården, Aalborg 
Renovation of older and worn multi-story housing with 134 apartments (1, 2, 3 and 4 rooms).

Task:
According to BR15 (the Danish Building regulations) a mechanical ventilation with heat recovery is a requirement in this type of buildings. To install a ventilation system with pipes would be expensive and difficult in the existing apartments.

Solution:
MicroVent is a pipeless ventilation system, which is installed directly into the façade and therefore is easy to implement in the construction process. In this case, MicroVent is installed just above the windows and is delivered together with the façade elements.

Effect:
Since the residents have moved back into their energyrenovated
homes, they find that they have a far better indoor climate with a low power consumption and high user all without it occupying space in the property.
Download case: Apartment buildings (0.7 Mb)
I would like
To receive a phone call
 
To book a meeting
 
Contact person:
*
Company/institution:
 
Address:
 
Area code:
*
City:
*
Telephone number:
*
E-mail:
*
Message:
 
InVentilate | Orionvej 2 | 7430 Ikast | Tlf.: +45 72 30 10 24